I ran out of juice about 6:00.  I think schlepping 70 soaking wet, heavy, treated 12' 2x6s from my trailer out front to the back yard took it's toll.
Last Saturday morning there was only 6 holes with concrete piers with a threaded rod sticking out.  So 2 days of digging and pouring piers, 2 days of building beams and setting joist and 2 days of laying boards so far.  Also two of those days I got late starts because I went to the lumber yard to pick up massive loads of lumber.  Not horrible for an old man, though if I was 5 years younger I would be done right now.