So I have an XD-M .45, I plan on Cerakoting it. And it will need to be cured in oven after spraying it.
The Cure Schedule is 1 hour at 300°F or 150°F-180°F for 2 hours.
Clearly the Polymer Frame and Back Straps cannot take 300°F and the alternate schedule at lower temps for 2 hours is the way to go, but...
Does anyone know of a max temperature that I can expose the Polymer to, without damage,
The Cure Schedule is 1 hour at 300°F or 150°F-180°F for 2 hours.
Clearly the Polymer Frame and Back Straps cannot take 300°F and the alternate schedule at lower temps for 2 hours is the way to go, but...
Does anyone know of a max temperature that I can expose the Polymer to, without damage,